Did good wiring on our Xantrex 2000 charger inverter - 2010

Got a lot of wiring done.
Removed all the wires off the batteries and installed them on the busses. Had to drill out some connectors. Used a hand clamp to hold them and turned the torque down of the drill. Worked good.
December 2010 -  Currently At Marina Cortez Harbor Island, San Diego

Got Xantrex charger\inverter hooked up to a switch and then to the buses.
Got the T fuse block hooked up and ready to except some devices.
Got the new engine ground wire installed.
Got the shunt installed for the Link 2000
Still a ways to go.
A lot of labeling needs to be done. Debbie does that as she can write nice.
The wires need to be secured and bunched together.
The starting battery need to be re-installed and a selector switch installed.
The two Blue Sea Systems 130 amp buss need installing and one fuse block, the wires need to be run to the batteries.
 We will need a main AC 30 amp breaker from shore power to the Xantrex charger\inverter. Then the AC will be supplied to the Main AC panel from the Xantrex chrager\inverter. That is how we will install it. This will get installed behind the nav station out of sight.
But all in all we are getting done with the main hard part.