We installed the plywood along the back of the nav station wall that separates lazarett from the nav station. We also got the piece on the top so now it is ready to make a removable cover so the rain does not get in the back of the nav station if we open the lazarett door.
We can also now install the 30 amp breaker for the Inverter\Charger (I\C) to protect the wiring. Also we can now run the 110 volt 10-3 wire to the shore power plug and then from the 30 amp breaker to the I\C.
Also we can wire the I\C to the electrical panel so we are on a role if we get some boat time. The weather has been suckie! First day of spring tomorrow so let’s act like it please weather :)
No comments:
Post a Comment