Propane locker - fiber glassing the box -2011

 The propane locker is coming along. Over the weekend we got some more fiber glassing done on the edges.
February 2011  - Currently At Marina Cortez Harbor IslandSan Diego, CA

 Tuesday we got some more fiber glassing done. Now all the outside edges are done. All four corner edges are done on the inside and a few other spots. We now need to fiberglass the bottom edges and a few mic spots and then the top edge all around. Then we put on the fiberglass matting. Then we go over with a final coat of resin. Of course there is sanding in-between.
Note:
 I did over glass this box which makes a bit heavy. I could have used less glass and resin.

 A dock mate Hinze gave us a drop light that he got from the dumpster. It worked great to light up the inside of the propane locker to work in. The bulb even worked!
 There are a few spots I screwed up the fiber glass with the paint brush, too much brushing and I will need to go over those spots later. No biggie.

No comments:

Post a Comment