We did some plumbing organization. - 2012

Not shown in the picture is chafe protection for the wires.
 We putt in a terminal block for the macerator so if it craps out (get it) we can just remove it without having to cut wires.  We wired the 10 AMP blade fuse, so it was easily accessible.
May 2012 - ⛵ Chip & Debbie 💑 - Currently at Marina Cortez Harbor Island, San Diego, CA

 We will also stake down the pump out hose more so it does not jiggle at pump out time, shaking wiring. Not sure if it does now but just in case.
 We cut a hole in the bottom of the cabinet and ran the shower sump vent hose up there where the holding tank and fresh water tank vents are located. Next we will get a through hull vent to attach it to but that may just be a Mexico project as it works and there is limited time. We will buy the part and out it on a later list.

We wire tied the hoses and will need at a later time to shorten up the shower sump discharge hose as it is a bit long.

 We are not using the holding tank vent hose filter at this time so the bracket is just sitting there. It may need to be re-located if we go back to using it.
Notice our cushions are not screw in yet. Still in project mode :(
It is a tight space to work in and it give soar ribs and under arms as the access hole is small.
We will need to add a AC through hull here some place also and it is not a later thing :😀

No comments:

Post a Comment