Wash down pump bilge plumbing is finished

The wash down pump bilge plumbing is finished. We still need to secure the valve and the hose but it is done in the bilge.


We put the ¾ non-kink hose onto the through hull valve fitting and then to the valve to the pump. Then the ½ hose to the strainer.


 Now to plump up the pump and the Y valve in the chain locker.

No comments:

Post a Comment