Debbie re-located some wiring for Mermaid Marine Air HVAC unit - 2012

Debbie labeled the wires running across the space for the Mermaid Marine Air HVAC unit. These wires weed to be moved.
June 2012 - Currently at Marina Kona Kai Shelter Island San Diego, CA
 
 Now that the plumbing is out of the way it is time to move the wiring under the salon seat for the Mermaid Marine Air 12000 BTU AC\Heat unit. This is where it will sit.
 Debbie jumped in here and moved the wires. One set goes to the shower sump pump and one pair goes to the curtsey lights.
 They are however not all the same size and all needed to be lengthened.. One in each set is larger I think.  
At least one is large any way.
 Debbie gather some wire and terminal ends along with the heat shrink.
She got the heat gun strippers and crimpers and wire cutters and went to work.
Debbie is wire tying each set of wire extensions together.
This is time consuming and heard on the body bending into the space.
Debbie wrapped the wires around by the mast wiring terminal block then the mast and then forward to the bulkhead where she finished off them off. 
After they were extended and re-routed away from the bottom space she secure them and the other wiring along the side s with wire ties with the screw holes in them and some SS screws.