Teak work -cover the spinnaker pole holes 2010

Finally! We found the teak oil we bought. The stuff in not inexpensive. We bought it to math up the teak we are working on so we can then varnish it.
 We did two spots.
October 2010 - Currently at Marina Cortez Harbor Island, San Diego, CA
   The teak board we put up to cover the spinnaker pole hole from the PO and where the new fan is going to go. It has one coat of teak oil. We will wash the surrounding teak with TSP and see how it blends in. We may need to give the new piece a second coat of teak oil.
The second place we are working on now is the cabinet over the bed. I only did a section to see how it would look. Besides there are more teak plugs I need to put into old holes from the light that was there and want them to be oiled also. Looks like the same drill as the other spot as we will need to play around a bit to get it to match up. Here there will be two LED SS reading lamps and two tow blade quiet fans. That will help blend in the teak as it will be partially covered.
Looking up from the pillow.

No comments:

Post a Comment