Bow anchor locker and chain locker almost finished - 2010

September 2010 - At Marina Cortez Harbor Island, San Diego, CA
We finally almost finished off the anchor locker and chain locker.


We have a couple small items to do. A couple places in the anchor locker need a little gel coat repair. These two areas are from the previous owner storing a Danforth anchor in the locker and it rubbing through the gel coat into the wood.

Also want to put a stainless steel scoop on the door to cover the hole made for the anchor CQR shaft by the  previous owner. This will keep out big wave water, just in case.

Also we re-did the chain to payday line and want to put some liquid whipping on it because we do not want to remove it then whip it then re-install it etc.

The old set up for the line is shown in this photo.

That’s about it.

And also need to label the two fuse holders.

Shows light on in red and white and the cover for the houser pipe off for light and air.

No comments:

Post a Comment