Teak and Holly installation, and Hinze’s 42 FT Gulf Star - 2011

April 2011 - At Marina Cortez, San Diego, CA
That's Hinze and his 42FT CC Gulfstar with the red kayak on it.

 Went to the boat last night to work on the refer. That was a no-go as Owen was busy working on the teak and holy sole. But I did stick my hand inside the refer and checked the epoxy and it was hard! Good deal, that means we are good to go with this method. The bad news is that because we will not be back to the boat for a week there is no way we are going to finish up the Frigoboat refer\freezer project before we move aboard. 
Guess we will be using a cooler, oh well it is still spring time.

Owen took a break and I got some pictures and video. Then we talked by Hinze’s boat and Hinze explained his rigging etc. 

We chatted for at least an hour or so and by then the evening traffic was over so I could go back home.  Hinze has a 42 FT Gulf Star CC and is putting in Newfound Metals SS ports. 
Hinze’s boat, 42 FT Gulf Star CC.
Hinze’s boat, 42 FT Gulf Star CC.
Hinze’s boat, 42 FT Gulf Star CC.
Hinze’s boat, 42 FT Gulf Star CC.
Hinze’s boat, 42 FT Gulf Star CC.
 He has about four in now. They are much larger than ours and look real nice. He did not choose the tinting but will add some film later. He will be going cruising around the same time frame as we are only is not going on the Baja Ha Ha.
 I told Owen we would not be back to the boat for a week as it is a Debbie birthday weekend and we did not want to be in his way and besides there was not much we could do as there are parts of the deck being epoxied down.
  So below are some picks and a video of the new Teak and Holly sole going in.

No comments:

Post a Comment