September 2012 - Marina Kona Kai Shelter Island San Diego, CA
We cut it to size and then drilled two extra holes in the modal as recommended by Dailey. Then we drilled the mounting hole into the rubber and cleaned it all up.
We applied 3M4000 UV Marine Adhesive to the back of the module to hold the rubber in place for ease of mounting.
We made some good progress on the Spectra Ventura Watermaker 200T Deluxe.
We had purchased some rubber for backing of the pump module as recommended by Dailey Water Markers.
Drilled two holes on the inside towards the middle.
We cut it to size and then drilled two extra holes in the modal as recommended by Dailey. Then we drilled the mounting hole into the rubber and cleaned it all up.
We applied 3M4000 UV Marine Adhesive to the back of the module to hold the rubber in place for ease of mounting.
Then after it set up we mounted the module in the cabinet.
The ½ hose from the ½ through hull we had run to the module before. To be sure of the setup we called Spectra support ((415) 526-2780 Tech Support: techsupport@spectrawatermakers.com)
We even connected the fresh water rinse hose to the module.
and found out that the 1/2 hose is too small. They want a 5/8, so we will re-run with a 5/8 hose (15').
We also bought more hose from Dialey for the pressure gauge and the test facuit. Could be we will install another faucet at the sink for testing the Spectra Ventura Watermaker 200T Deluxe.
No comments:
Post a Comment