This web page has some good videos for the testing solar panels and solar controllers from Blue Sky Energy Inc.
January 2021 anchored in Tenacatita, Mexico
Had to remove a few cables to get at the shunt wires from the Link 2000 and Blue Sky Energy IPN ProRemote.
The little screws on the side of the shunt holding the wires are small and not that easy to get the screws out or in because there is not a heck of alot of room. What's new?
First we had to remove the wires from the shunt, the yellow and brown for the Blue Sky Energy IPN ProRemote.and orange and black for the Link 2000 , Then put the yellow and brown wires on the same screw and re-install the cables etc. and run the solar controller. That reset and calibrated the IPN ProRemote. Then take the cables off and put it back the way it was and re-install the cables etc and we were done.
Debbie has smaller hands so she did the last two wires.
You can see the current charging amps are the same on both, it is still early morning sun wise..
Volts are somewhat close also.
No comments:
Post a Comment