Debbie worked on the refer insulation and I did some davit work. Turns out Debbie got the worst of it. The refer insulation is a pain right now because it is the freezer side we are working on and the back to boot.
The temperature is still cool in the low 60’s so the glue does not set up fast. That means the insulation needs to be braced in place on the walls.
We tried duct tape but no luck there. Then clamps worked on some and we cut some insulation and used it on the back pieces by bracing it against the other side as you see.
The pile of insulation you see still needs to go in and more.
We have these pre-cut pieces still to be glued in and Debbie glued in a bunch.
Then there will be more to cut and glue in.
We did not get done till 8:00 PM and we go to bed at 9:00 PM. We still needed to shower and work comes early. There was still more pre-cut pieces of insulation to be glued in but not enough time. We need to get this insulation in so we can start cutting some more pieces to be installed.
No comments:
Post a Comment