Refer shut down for lid glassing and painting - 2012

July 2012 Marina Kona Kai Shelter Island San Diego, CA
 Debbie turned off the Frigoboat refer unit a couple days ago to finish off the lids. They will be sanded and touched up with fiber glass and then panted. We will add a seal around the forward freezer hatch and also drill out a couple or few of the refer spill over holes. There are five of them that the fan puss air in to the refer with. The cold air gets circulated around the refer then returns to the freezer for cooling. At higher temperatures on the freezer side the fan is on more so we think the holes could be made a little larger. Than fan is like a small computer fan and does not draw much but we are fine tuning the refer now so everything helps.

No comments:

Post a Comment