November 2011 Marina Kona Kai Shelter Island San Diego, CA
The solar panel wires got routed through the deck cam clam and into the rear lazarett for now. This we needed to get finished because we are hauling out for some work and did not want all these wires hanging about. The wires for the flood light will need to get routed through the cam clam yet but now. It first need to get installed anyway. The cam clam looks good and will prevent water from entering the boat.
The solar panel wires got routed through the deck cam clam and into the rear lazarett for now. This we needed to get finished because we are hauling out for some work and did not want all these wires hanging about. The wires for the flood light will need to get routed through the cam clam yet but now. It first need to get installed anyway. The cam clam looks good and will prevent water from entering the boat.
It first need to get installed anyway. The cam clam looks good and will prevent water from entering the boat.solar panel installation bristol
ReplyDelete