Saturday we finished off the freezer tops so we could use the system.
We had
previously cut the back refer Dow Blew board (DBB) to fit but it needed some
more custom fitting. We also decide that because the tops got so cold we really
needed to install the other freezer lid DBB. That meant making up another custom
piece of DBB. The stuff also makes a mess. After lots of shaving and cutting we
got both pieces close.
Trimming the DBB.
Shaping the DBB.
Fitting the DBB.
More fitting.
More shaving of the DBB.
More shaving!
Debbie cut and installed the seals for the lids.
The two freezer lids sitting on the settee with the DBB sitting in place.
Not perfect yet as there needs some final pieces to fill the voids.
Ready for gluing though.
Debbie made some templates and figured out the DBB placement on the lids.
During
this time we placed a piece of DBB into the lazzeretti lid opening on the refer
side as this is no getting used at the moment.
This will be the last lid to get
done. We did put the rubber lid seal all around it.
OK this is all done and we will let it cure up and on Sunday
morning fire up the refer\freezer for it’s intimal use!
No comments:
Post a Comment