Plumbing the Mermaid Marine Air 5200 BTU - 2012

April 2012 - Marina Kona Kai Shelter Island San Diego, CA
The Mermaid Marine Air 5200 HVAC unit got some action by means of work on it. We ran the ½ tubing up from the bilge.
We used our snake to get into the hanging locker. 
 Debbie’s is using it so I need to be careful here. The snake ran up fine and then I tapped the hose to it by slipping it over the snake and taping it with duck tape. Then pulled the snake back through. Lot easier than having Debbie empty the hanging locker and removing the shelf to do this. Now we can do some more plumbing making some more progress before hang to dig deep into her hanging locker.

No comments:

Post a Comment