First off we put terminal ends on the bus side in the nave station. We ran the green #10 ground wire from the 120 volt ground bus to the neg Blue Sea Systems 400 amp battery bus.
The cut the wire to length and added the other terminal end and attached it to the bus. We used one of the side #8 screws for this on the 400 amp bus.
The cut the wire to length and added the other terminal end and attached it to the bus. We used one of the side #8 screws for this on the 400 amp bus.
We then cut the 10/3 wire to length (the three strands of #10) and attached terminal ends to them and attached them to the respective buses. Then staked them all down.
The other grounding wire is at the top of the bus with the green wire on it and not shown.
Now the 120 volt
wires from the Xantrex inverter charger are all set to go.
Once we get the chassis grounding cable we can put in the duel
pole 30 amp breaker and finish this thing off.