The freezer insulation got rimed out a bunch so we could put a one inch thick piece of Dow Blue Board DBB) in and have it straight up and down. This is what the evaporator plate will attach to, well on this side of the refer any way. Debbie attached the spacers that come with the evaporator plate that go between the freezer and the plate to the cardboard template with blue tape. We fit is in until we were happy with the size. Debbie glued it into place and we will drill a few holes in it so we can foam the void behind it and then foam around it. This is the last insulation we need to do. The tops will need two inch thick pieces of DBB but that is not hard and can be done on the work mate on the dock, no bending and banging the head and far reaching places etc.
No comments:
Post a Comment