There are eleven coats on the louvered door behind the toilet. It is nice to get this done and Debbie is working on the frame of the door on the boat. Went to get new hinges as this was the very first part we tried to varnish we replaced the hinges. That required fill and drill for the screw holes. We found some new hinges at San Diego Hardware for a couple bucks. Later we discover we could clean up the old hinges and re-use them requiring no fill and drill. When we stripped the water based varnish off this door (the water based varnish was a test) I messed up the hinges. So back to get new ones but I brought the wrong ones so next time.
No comments:
Post a Comment