Used the Dremel tool to cut away the flange deep enough for the new dorad base to fit in.
August 2013 - Paradise Village Marina in Puerto Vallarta Mexico
The new dorad base in the "Open" position. On the bottom side it has about a 1\2 flange which sits below the deck.
After removing the screws the out side ring got busted off using a chisel and glass hammer.Mostly cleaned up and ready for dorad and base. For now we are not going to put any sealant around the dorad base, just screw it in, well after drilling the holes :) We are deciding how to handle the open close feature of the dorads.
We have a 1978 Islander Freeport and it has hoses that run to the bilge and then the engine room.
Starboard side done!
Rember to drill the screw holes on drill bit bigger or so through the gel coat so it does not chip away.
Now for the port side.
Old and new. Old on port side.
New and new. The port side looks like it has a tooth ache. They were both in the hanging locker and got squished for six months. It will straight out or we will make it so 😊
No comments:
Post a Comment