Installed our Harken blocks to the dingy davits 2012

2012 Marina Kona Kai Shelter Island San Diego, CA
We installed our Harken blocks to the dingy davits and will be doing a test hoist this coming week.
As soon as we get the mast back in. The dingy bottom will need to be washed every 2\3 weeks if left in the water.
Note:
A couple years later we realized these Harken blocks are really too big. We could have used smaller blocks. The Achilles LSI-310E dinghy does not go as high up on the Kato Marine Island Davits because of the size of the blocks.

No comments:

Post a Comment