The original bilge pup in now sitting in the spot it likes and needs to be plumbed.
SHURFlo Extreme™ Smart Sensor pump is cycling
OK our new SHURFlo Serial # 5901-2011 Extreme™ Smart Sensor
5.7 Fresh Water Pump 12 VDC is cycling about every 15 seconds at times and this
is not something we want to have happen. This happens after it sits for a while
like at night and it seems if we turn it off and then on, it resets. When it
cycles it goes on every 15 seconds or so for 2 or 3 seconds then shuts off. Not
a big deal but it will wear on the pump and it is defiantly not working
properly if it is doing this.
This mostly happens at
SHURFlo support said it could be some tiny debris in the
head of the pump. SHURFlo support said that
we could try to take it apart and find it (the debris) or send it back for
replacement. We will send it back as it is easier and less time consuming. We
do have a filter screen in front of the pump to prevent this. The dam thing is
brand new! This means we will need to bump up our re-building our old pump so
it can serve as a replacement while this one gets shipped in.
Labels:
Fresh water system
Vent hose for holding tank
We are getting a bit of an odor in the boat and last time
that happened it was on our Catalina 30 and was from the holding tank vent
hose. We had over filled the holding tank and it went up into the vent hose.
That vent hose had a loop in it and would hold the gray water. I guess in 1983
Catalina did not think to run the vent hose straight up. In fact there was no
clear path to do so. Any way we replaced the vent hose and what a difference.
So guess what. We have two holding tank gauges and do not think we over filled the
holding tank (and it is 34 gal verses the 18 on the Catalina) it but because
the other two hoses going out of the boat are brand new we will replace this
one. This one we put in when we bought the boat as replacing the holding tank, toilet
and all accessories was our first big project. We have just replaced the vent
hose filter but it did not seem to help much.
Labels:
Head
Cable Clam stalling :)
OK we are stalling because cutting another hole in the boat
is not natural. This Cable Clam by Blue Sea needs to go in soon. Next week probably. We also
need to order the solar panel wires.
Labels:
Solar Panels
Cap rail hull side starboard
The cap rail on the starboard side on the hull side needs
some touch up because we trimmed off the Life Caulk caulking we had applied
there. We removed any varnish and sanded the area. Now some parts need to be
re-caulked. The taping is done for those spots and this will be done before we
move marinas as we will not have a finger pier in between the boats in the
slip. That means we will need to turn the boat around to work on the side
without a finger pier. In our case as we like to be stern in for now the
starboard side is the looser for a pier. Next we need to put the boat bow in so
we can get that area.
Labels:
Deck
All 3 solar panels mounted on the bimini - 2011
We got the 2 Kyocera
Solar KD-135GX 135 Watt 12 Volt Solar Electric panel solar panels (SP) mounted on top of the bimini. Also the 1 Solartech 85 Watt Multicrystalline Solar Module panel mounted in the middle.
Labels:
Solar Panels
Port lower cap rail calked!
Another big deal we got done besides working on the refer
was the port cap rail. This has been the other pain in the “you know what”. It
has been leaking and we caulked it once but used 3M 100 before they
discontinued it. We also did not remove the varnish from the cap rail. It still
leaked some. SO we stripped the cap rail of it’s varnish and stripped the 3M
100 from the cap rail, a real pain. Then I put on gobs of 3M 4000 UV. It worked
great only like I said gobs of it. It was a test. To varnish the cap rail this gobs
of 3M 4000 UV would need to be removed. So we did and again it was a real pain.
SO this time is a charm we already did the starboard side in the lower areas by
the big windows. This time we did the port side by the big windows. This is
where the water collets. Go it done and that was the big deal. We will be
finishing up the rest of the cap rail this winter as it does not leak much and
is a lot easier.
Previously when I put gobs on
Also this time I added some brown paper to the deck to keep it clean from my mess making
We are also going to
do the stanchions. We do not want to take on re-bedding them at this time but want
to have a dry boat. To this end we will tape them off and put some 3M 4000 UV around
them and their screws and make it look nice while sealing them up.
Labels:
Deck
Freezer work coming along
Debbie got some more
freezer work, and a lot of glassing done.
Debbie cutting some wet with epoxy fiber glass
I know that hand!
Remember the "hand" from the "Monsters" TV show?
Well this in not it as Debbie could be a hand model :)
Yep it is Debbie's!
Some day this will be Debbie getting ice cream out from the freezer
We had glued and sanded the top edge but had
missed a spot with the glue. Also that eight inches or so had to be re-glued
and the previously glued area needs to have epoxy paste put in the voids. We
call it bubbles as it is fiber glass bubbles. The Debbie was able to get two
more lawyers of fiber glass on the freezer and the final layer of fiber glass
matting on the bottom. Now we need to finish off the top edge with another
layer or two and do that eight inch length on the top with a few areas. We are
shooting for painting this coming weekend. Ya!!
I fit the top on the
galley side of the refer and it is ready for sanding on the inside of the top.
Then we will mark it for insulation. This took a while longer than anticipated but
what’s new? :)
Labels:
Refer
Dual Alternator smart controller for the twin alternators - 2011

ADVERC 12 volt Twin controller
We were seriously considering buying a smart controller(SC) for the twin alternators. Now we have decide to wait till we get our new AGM house batteries because the SC will not do us any good now.
Labels:
Electrical,
Engine
Water pump mounting plate installed
We put in place the fresh water pump mounting plate we made
from marine ½ plywood.
We also purchase longer screws ans some SS washers for mounting the pump and plywood.
We also purchase longer screws ans some SS washers for mounting the pump and plywood.
It did the trick so now the pump vibration damping
rubber feet will not sink into the engine room sound insulation making the pump
un-stable. The side effect was it moved the hose to the water tanks out a bit
and we discovered a small drip where we hooked the pump to the T from the water
tank pipes.
A small drip from here
These we would really
like to re-plumb.
This is 5/8 hose as all the small Trident Oder shield and fresh water hose on the boat is 5/8 for the smaller stuff. We do have some 3/4 for the shower sump and 1 1/2 for the pup out and maceration hose etc.
We will attach these fittings to the bronze pipe that the original fittings are attached too. Then the T will go in. This will not be so brittle as the original setup as this pump is ment to vibrate some, keeps it quiet.
The 5/8 hose fits on these 1/2 fitting nicley
We went out and bought some new heavy hose and fittings and it is on the future list of things to do. In the meantime tonight I will try tightening the fitting so it stops the leak. You know how that goes; it could be we do the project now if it breaks. At any rate it will get done at one point.
This is 5/8 hose as all the small Trident Oder shield and fresh water hose on the boat is 5/8 for the smaller stuff. We do have some 3/4 for the shower sump and 1 1/2 for the pup out and maceration hose etc.
We will attach these fittings to the bronze pipe that the original fittings are attached too. Then the T will go in. This will not be so brittle as the original setup as this pump is ment to vibrate some, keeps it quiet.
Labels:
Fresh water system
Engine room hatches, sanded edges
We sanded the hatches for the engine compartment so they
would be easier to remove. They have or had varnish drips and drool’s on the
sides making them sticky. One of those side projects that got thrown into the
mix. We were removing the hatches for the water pump re-mounting so we did this
as it has been a “make life easier” project on the wish list.
Labels:
Engine
Helm seat refurbish
Debbie got some more chair sanding done and she picked up
some sand looking (in color) paint.
She also dropped off the old hinges at R.W. Little's to get
them painted black. We decided the fill and drill was too much work for the
project it is and we can recycle the hinges we have that work already.
Labels:
Cockpit
We are moving to a different marina!! - Kona Kai Resort - 2011
October 2011 - Marina Cortez San Diego, CA
Resort marina here in San Diego on Shelter Island.
Marina Cortez
That’s right after eight years with Marina Cortez we are moving to the Kona KaiResort marina here in San Diego on Shelter Island.
Labels:
San Diego
Helm seat arms refurbish by Debbie - 2011
Debbie has made a new Sunbrella back.
Debbie has taken on the helm seat refurbishing. Not that simple of a job as it turns out,
Labels:
Cockpit
Solar panel frame was modified
The solar
panel (SP) frame was modified to clear
the bimini. We added 2” on all four uprights. Forward SS uprights were 10 ¼ inches
and we added 2” to make them 12 ¼ high.
The stern
uprights were 12” long and we added 2” so 14” is what they are now.
Now the SP frame clears the bimini fine.
We also
decide to add some supports to the frame and with the four:
Jaw Slides MH265 SSD from Keystone Brothers.
Keystone did not have any heavy duty end caps so we used some we have for now.
We will fasten stern of the middle SP as we did the bow end and this should eliminate most of the sag to the frame you see here.
Of course it takes a fair amount of time to get these things mounted so we only got one done so far. We were able to use the old 1" SS tube upright from the forward mount for the brace.
I did drop one in the drink so we are one short and will need to cut one :)
We also
purchsed two 1” SS Fitting tes from www.marinepartsdepot.com, now that
they sent us our previous order.
These we will install on the sides of the SP frame
to give it strength. Also we can hang our bimini side curtains (to protect us
from the sun) from these.
We will decide later if we want to have this welded up instead of using bimini hard ware for the SP Frame. Also we may want a SP frame to deck support for further strength.
Labels:
Solar Panels
More engineering needed on the solar panel mounts
More engineering must happen on the solar
panel (SP) mounts. We replaced the flat aluminum bar with a SS 1” tube and it
worked great. It is really sturdy and looks good even though you will not see
it. We will add end caps when done. We like this setup so much that we will do
the stern mount of the 85 watt SP the same way after we determine how much SS 1”
tubing we have left. We still need to mount the wind generator and need to two
pieces of 1” SS tubing for the stays.
Before the middle panel it was sagging on the front mount
Cut tubing
Not sagging now!
The problem now is clearance. The two cross pieces
of 1” SS tubing that hold the panels up over the bimini are just about the same
height as the bows that hold the bimini.
The SP ones are crossing the bimini where the fabric is sagging a bit making it possible to be the same height. This changed with the middle panel. Now there is not enough clearance. We probably should raise it any way but now it is a must. The whole grid will need to come up about two inches. Sounds worse than it is. We will curt four new uprights two inches longer for the corners and it will get raised two inches.
Bimini SS bar is same height as SP bar
Lower than it looks
The panels are nice and even
Labels:
Solar Panels
More freezer classing
Debbie
did some more freezer classing. Debbie sanded the fiber glass that she had done
and vacuumed and wiped out the freezer with a tacky cloth. She got some big
pieces on the sides and then ran out of epoxy. This is great stuff as we have
turned the corner on the refer/freezer!
Debbie making epoxy
Labels:
Refer
Subscribe to:
Posts (Atom)