We mounted our new boat hook and Debbie put on the bungee chords for security against me loosing it again. They are easy to hook and unhook, get the pun : )
We are currently cruising our Islander Freeport 36 sailboat in Mexico. We have been extensively documenting our outfitting for this adventure. Also, what works and what is not of value.
Pages
▼
Bye to sten rail VHF antenna - 2011
The VHF antenna had to be removed for the dinghy davit installation. Well we thought it did, as it turned out it could have stayed.
Wheel holder
Here is the little cover we put on the wheel shaft. Debbie picked it up. It is a swimming pool stick. We can use the rest of it at the pool!
Stern steps
We were going to replace the cables on the stern steps this past weekend but it was just too much to do.
They are really life lines and they are bolted through. It will take a trip into the lazarett by Debbie to hold the nut or wrench it off so they can be removed.
Later this week or next weekend while we have the boat stern too we will get them off.
Window shade screens - Starboard - 2011
We installed the snaps for the starboard side window shade screen.
Looks good and works nice.
Davits - installing
We attached the new brackets from Kato Marine to the new welded bottom of the brackets.
We got the dingy davits set in place, we did a lot of adjustments and then slept on it.
First thought
We duck taped them to the stern rail at the bottom.
The next day we decide to move them inboard some.
That way we could fit the outboard motor on. It seems a good fit so we slept on it again.
Then we decide to go ahead and drill the holes and size up the screws for purchasing.
To do this Debbie went below into the lazarett
Debbie searched out the spot for the brackets with her left arm.
Debbie was looking to see also if the backing plates would fit
The area was clear of any issues that would prevent us from drilling through.
And another whole
Last whole, we marked them off using the backing plate, a Debbie idea that saved us some work
Sizing for the length of the screw wholes. Need to get the screws the right length, that mean Debbie had to go back into the lazerette : )
OK one side is set up for final install. We still need to get the real screws and then bolt them in. That will require yet another trip into the lazerette for Debbie!
The davits look straight but being nothing on the stern of the boat is straight up and down it is a bit hard to tell.
We could have moved them inboard another 1/2 inch. We had that much clearance. That so far is the only thing we wish we had done. Not a big deal but every bit of room for the outboard does matter.
Next the other side.
A couple temporary screws in to hole this side in place
The davits look straight but being nothing on the stern of the boat is straight up and down it is a bit hard to tell.
We could have moved them inboard another 1/2 inch. We had that much clearance. That so far is the only thing we wish we had done. Not a big deal but every bit of room for the outboard does matter.
Next the other side.
Power washing and Woody's Wax
We scheduled ourselves for power washing and Woody Waxing the boat.
We got the power washer all set up and Debbie was ready to start washing when the power hose popped off.
It has been stripped but we cannot remember how that became to be. Any way after trying duct tape and other means Debbie suggested using plumbers tape.
I was skeptical but will try anything. I could not find the plumbers tape so we used the propane tape. Dam if it did not work great. Now Debbie was off and power washing.
Debbie got it all done including the cockpit. We then followed the Woodys Wax instructions.
It came out fine as water beads off. I was a little disappointed that is did not make the deck shine but it does work well. We will apply another coat in a week or so. Hoping this will make it easier to keep the boat clean.
Sing along with family with RainSong guitar
San Diego, CA Marina Cortez 5\31\2011
My sister in law and her husband and my nephew and his girlfriend came by to visit us at our house (the boat).
Installed two more propane sensors
The new propane sensors and cable came. We got them installed but one keeps going off. The one in the bilge. We will need to figure that out.
We installed on in the bilge by the starting battery below the stove.
We installed one by where the new propane locker will go.
We already had one under the stove.
Got the 5200 BTU stateroom HVAC unit on the boat - 2011
May 2011 - At Marina Cortez Harbor Island, San Diego, CA
Here are the specs for this Mermaid Marine 5200 BTU HVAC unit
Kato Marine Island Davits - Harken 6.1 blocks - OK - 2011
After we had the davits in place set up temporarily I could not resist putting on our new Harken 6.1 blocks and line. They looked so nice. We had polished up the davits some so were looking a bit nicer.
Fuse for fuse block
We installed the fuse block to protect the fuse bloc.
Now to wire it up!
That means we need to take some line and measure the wire run from the batteries to the fuse block. Not that easy as it goes under the bed through the bilge and under the settee.
Original bilge pump - assembly - 2011
One of the small screws was stripped. It is on the lower right corner.
So, we got the new fasteners and started to put the pump back together.
New windlass cable lugs
File photo, these are not the exact ones we bought :)
Stopped at Meraine Exchange (ME) and picked up some ANCOR Lug - Ring - Heavy Duty – Tinned for the 2 awg windlass cables.
File photo, these are not the exact ones we bought :)
Now to put them on.
New Shroud boat hook and handle
OK got another Shroud boat hook and handle. This time we will make sure they are bungeed or tied down plus hooked into the clips while not is use!