- We cleaned up the anchor locker and made a quick bridle.
- We prepped the old anchor foot switch hole for filling.
- We bought two new Lewmar foot switches for installation.
- We also got the quick disconnect installed and I fixed the leaks in the house connector.
- There is still a small drip at the elbow on the selector valve that will need to be fixed.
- Also mounted emergency anchor retrieval windlass handle (manual mode).
Pages
▼
Bow anchor locker work
Elegant'sea



No comments:
Post a Comment